Here is the follow up of the ‘DEMOLITION’ project that we started at the end of January. Today, February 7th it is all set and ready for the final phase: taping of entire area
Scope of Completed Work:
2nd Floor:
Demolished all plaster from the walls,
Demolished the dropped ceiling in S/W bedroom
Demolished all doors, trims, casings, baseboards
Removed flooring in the bathroom
Installed new ½ inch regular drywall
Installed blue drywall in bathroom
Ready for TAPING
1st Floor:
Demolished plaster
Demolished all doors, trims, casings, baseboards
Demolished the non-structural wall in Easters addition space
Removed tub, sink and built-in cupboards
Removed flooring
Installed new ½ inch regular drywall
Ready for TAPING
Basement
Removed non-structural walls
Removed plaster on N/S partition wall
Installed new blue drywall on the external walls
Installed drywall on ceiling and around ducts
Ready for TAPING
Here are some photos of the site at the current phase of drywall installation completion and ready for final phase; Drywall Taping:
Please follow this blog so you are able to take a look at the finished results of our professional drywall taping team, soon to come. Feel free to ask any questions about the process of our job.
If you are looking to start your own project give us a call or email with some basic information; dates you would like to start, what type of job that needs to be done, location, ceiling heights, floor area, residential, commercial, custom work, best way to contact you, etc.
Upper Floor:
Installation of Drywall ceiling board on ceiling
Installation of ½ inch regular drywall
North and South Side Wall: Installation of 5/8 inch x type drywall Main Floor:
Installation of ½ inch regular drywall (inside walls and ceiling)
North and South Wall: Installation of 5/8 inch x type drywall
Skim cote on the walls in dining and living rooms
Showers and Kitchens: Installation of dense shield drywall Basement:
Ceiling Installation of ½ inch regular drywall
Walls installation of ½ inch regular drywall
Dense shield for laundry room north wall
Basement Framing: wall in the basement Some Framing:
Dining Room Ceiling bulk head—4 sides with angled corners
Angled corner wall in the kitchen to conceal the drain pipes in the corner
Build out for future mounting of 3 ductless A/C unit
Shim the walls in living room and dining room Taping:
3 coats and sanded, ready for primer
One return visit for touch ups after primer is applied
For more information about our drywall installation and drywall taping services please contact us at 647 866 0201
On the third week of January, we began a new Drywall Installation and Drywall Taping Project.The residential site is located on Evelyn Avenue, Toronto.
Here is the Scope of Work:
Purchase and delivery of materials
Garbage Bin
2ND FLOOR
Demolition of plaster from all wall surfaces
Demolition of dropped ceiling in South-West bedroom
Demolition of doors, trims, casings, baseboards
Removal of finish flooring in bathroom—all other flooring remains
Installation of new 1/2 inch regular drywall, blue drywall in bathroom
Add drywall over existing plaster ceilings in all rooms
Taping, mudding and sanding of entire area
1ST FLOOR
Demolition of plaster from entire area including ceilings and walls
No removal of any structural walls
Demolition of doors, trim, casings, baseboards
Demolition of non-structural walls in Easters addition space ONLY and removal of tub, sink, built-in cupboards
Removal of the finish flooring
Move kitchen cupboards and appliances to basemen
Installation of new 1/2 inch regular drywall on all areas
Taping, mudding and sanding of new drywall
BASEMENT
Removal of existing non-structural partition walls, and built in shelvin
Remove plaster on existing North-South partition wall east of furnace
Installation of new, blue drywall on external basement walls over new insulation
Installation of drywall on ceiling and around ducts
Taping, mudding and sanding of entire area
Disposal of construction debris
No carpentry included
DEMOLITION began on the third week of January and is now COMPLETE, take a look at the images of the site before and after demotion:
We started the drywall installation and will be updating this post with more images of drywall installation process.
Please feel free to comment or ask any questions in regards to this project. If you are interested in our drywall installation or drywall taping services please contact us here.
Here are some more photos of commercial project that started on January 16th. It is located on the corner of Roncesvalles Avenue and Howard Park Avenue.
On January 14th we COMPLETED drywall installation project in the basement located in Brampton.
Check out the BEFORE and AFTER images:
Preparation for drywall installation (before)
After drywall installation is complete:
This project was only DRYWALL INSTALLATION in basement, completed within 2 labor days. For more information about our drywall installation and drywall taping services, please feel free to contact us at 647 866 0201
Here is a drywall taping project that we just started on January 16th for drywall installation and drywall taping.
The location of this site is on Humbervale Blvd. Toronto on the intersection of Bloor Street West and Royal York Road. Image of House From Outside:
This is a house with second floor addition, so we have some renovation job as well as new construction drywall installation and taping.
There are three levels: basement, 1st floor and 2nd floor. We will be performing work on all floors.
Here is a quick overview of the scope of work:
Upper Floor: Installation of Drywall ceiling board on ceiling
Installation of ½ inch regular drywall
North and South Side Wall: Installation of 5/8 inch x type drywall Main Floor:
Installation of ½ inch regular drywall (inside walls and ceiling)
North and South Wall: Installation of 5/8 inch x type drywall
Skim cote on the walls in dining and living rooms
Showers and Kitchens: Installation of dense shield drywall Basement: Ceiling Installation of ½ inch regular drywall
Walls installation of ½ inch regular drywall
Dense shield for laundry room north wall
Basement Framing: wall in the basement Some Framing: Dining Room Ceiling bulk head—4 sides with angled corners
Angled corner wall in the kitchen to conceal the drain pipes in the corner
Build out for future mounting of 3 ductless A/C unit
Shim the walls in living room and dining room Taping: 3 coats and sanded, ready for primer
One return visit for touch ups after primer is applied
The approximate time for this project is 10 labor days.
On January 16th we purchased and delivered all the materials to the site, carrying everything inside the house:
Site preparation is complete and on January 17th the real work will begin.
I will be updating everyone on the process of this project during the week and will be posting some photos of each phase
I will be posting some more photographs of the work in progress and complete works of this residential drywall installation and drywall taping project.
For more information about our drywall installation and drywall taping services please contact us at 647 866 0201
On January 16th we delivered materials to a commercial site for drywall and taping services. It is located on the corner of Roncesvalles Avenue and Howard Park Avenue.
Before Images:
This used to be a Dominion Bank Building of 2 floors plus basement level and now will be renovated into office space for a company called GEOSCAPE Contracting: http://www.geoscapecontracting.com/
Here is what will be performed during the 10 labour days: 2nd Floor:
· Taping of new drywall (washroom and kitchen area)
· Hallway and Staircase from second floor to first floor —skim cote on plaster 1st Floor:
· Installation of corner bids
· Skim cote on the walls
· Taping of new drywall on ceiling
· Skim cote of plaster on ceiling Basement:
· Taping of all new drywall (walls and ceiling)
· Removal of construction debris in garbage bin
The project started on January 16th and will end on January 26th if there are no changes to the scope of work from owner. Before Images:
This is the second floor of the building before renovation.
Windows on second floor of building before renovation
Bottom Left Image: second floor ceiling
We started installation of ceilings on the first floor of the building:
Taping of new drywall on the ceiling area on first floor
As always I am taking some shots of the condition of site before renovation and will be updating you on the process of this work throughout the week.