Follow UP: Drywall Taping RESIDENTIAL Project on Humbervale Blvd

Here is a follow up of a drywall taping project that we started on January 16th for drywall installation and drywall taping.

The location of this site is on Humbervale Blvd. Toronto on the intersection of Bloor Street West and Royal York Road.

Drywall Taping RESIDENTIAL Project STARTED on Humbervale Blvd

Here is our WORK IN PROCESS :

DrywallTaping.ca Follow UP: RESIDENTIAL Project on Humbervale Blvd

 

I will be posting some more photographs of the drywall taping in the entire house.

For more information about our drywall installation and drywall taping services please contact us at 647 866 0201

BASEMENT – DRYWALL INSTALLATION Project – January 14, 2012

On January 14th we COMPLETED drywall installation project in the basement located in Brampton.

Check out the BEFORE and AFTER images:

Preparation for drywall installation (before) 

After drywall installation is complete:

This project was only DRYWALL INSTALLATION in basement, completed within 2 labor days.  For more information about our drywall installation and drywall taping services, please feel free to contact us at 647 866 0201

Drywall Taping COMMERCIAL Project STARTED in Roncesvalles Village

On January 16th we delivered materials to a commercial site for drywall and taping services. It is located on the corner of Roncesvalles Avenue and Howard Park Avenue.

Before Images:  

This used to be a Dominion Bank Building of 2 floors plus basement level and now will be renovated into office space for a company called GEOSCAPE Contracting: http://www.geoscapecontracting.com/

Here is what will be performed during the 10 labour days:
2nd Floor:
·      Taping of new drywall (washroom and kitchen area)
·      Hallway and Staircase from second floor to first floor —skim cote on plaster
1st Floor:
·      Installation of corner bids
·      Skim cote on the walls
·      Taping of new drywall on ceiling
·      Skim cote of plaster on ceiling
Basement:
·      Taping of all new drywall (walls and ceiling)
·      Removal of construction debris in garbage bin

The project started on January 16th and will end on January 26th if there are no changes to the scope of work from owner.
Before Images:  

This is the second floor of the building before renovation.

Windows on second floor of building before renovation

Bottom Left Image: second floor ceiling

We started installation of ceilings on the first floor of the building:

Taping of new drywall on the ceiling area on first floor

As always I am taking some shots of the condition of site before renovation and will be updating you on the process of this work throughout the week.